In the name of Science
…blocked dimple sheet with 2×4’s and plywood until foam adhesive set up. With the wall prep complete, I proceeded on the back-fill starting off with some relatively rock free soil…
Featuring Nichiha
I am thrilled to announce Nichiha USA as the latest manufacturer to become a partner of theEnclosure. From the beginning of this build, I wanted some form of feature walls…
5 Years … and Counting!
…1st storey floor assembly is complete and all foundation water proofing, insulation, and backfill are close to complete. We also have a poured suspended garage slab and basement walk-up foundation….
Mud is Vanquished!
…will allow a more traditional approach where I complete the sub slab plumbing and pouring slab after a lot of the framing is complete. On the framing subject, my floor…
Floor Installation – ✔
…stair opening were supposed to rest in pockets on the north foundation. But because of the stair opening rebar placement conflicting with the dropped beam that would be placed at…
Reboot Complete!
…were a different storey. 1 set of batter boards had been completely pulled out by the tarp when it was hauled to the topside, and three others had been damaged…
All Decked Out
…day had a healthy 1/3 done. Decking continued throughout the week and was completed with a just a half day in today. Second Storey Deck Complete – Ready to Frame!…
About
…in a lasting legacy to the building science community and occupants for decades to come by making the dwelling available to the building science and engineering community for the purposes…
Variance Approved
…over the weekend to set up and had my site inspection yesterday where I dug 5 test holes for the engineer. I also was able to get an arborist out…
Wool Cap Complete
…the lower floor roofs. I had used a Sansin Blue Wood solution for the north roof (which was a test batch provided to RDH who had some left over and…