Overheated!
…combined run with a neighbour down the street. Eric was hear today and chewed through a large pile of 2x materials removing the nails and stacking for me. He will…
Cursed
…metal materials I had about the yard. Kind of wishing I had saved all of the appliances from the beginning of the project instead of dumping them for free at…
A tragedy
…because Williams Machinery hooked me up with a loner machine. I am so thankful for their generosity! The site in now basically flat and rubbish free. All parts of the…
Not yet
…compartments, and hung some temporary lights (using the temp light string I took out of the attic). After some more site cleanup (putting stuff away into cutting shack now that…
De-Energized!
…I will have with the cable coming from below the basement floor slab right into the base of the main panel. The final benefit to not installing the meter or…
Progress Continued
…window coupled to french door off the master bedroom west wall. Thanks for visiting! “Strength does not come from physical capacity. It comes from an indomitable will.” —Mohandas Karamchand Gandhi…
Suspended Concrete Slab – Complete
…for a soaker hose on Tuesday so I can ‘water’ my house. Best practice for a concrete slab include hydrating the concrete for at least three days after the pour….
Drained
…the foundation walls. I also need to change out the blue tarp. It was a freebie from Freecycle.org and although it does not have a lot of holes, the water…
Rim Boards Complete
As hoped, the rim boards started to progress more quickly once I had the right drill bit. Friday saw the west wall and jog at NW corner complete before I…
Trouble getting Anchored!
…the process of filling the basement up with the required crushed rock (less loads). Well, it certainly did not save time or money. The operator failed to come close to…