Floor Truss Package Installed!
…then the floor structure will be complete and ready for sheathing. I hope to have a majority of the sheathing complete by the end of the coming week. PS –…
First Second Floor Wall Complete
…assembly. I am behind ordering my roof truss packaged (by about 2 weeks). During my initial work on the package, I reviewed the Best Practices guide from RCABC.org and realized…
Permit Issued
…Guide dictating them admits are not necessary and only required because modelling the true performance of a structure through all of the secondary components is too complex and difficult for…
Small Victories!
…your values when they are being tested, they’re not values: they’re hobbies.” —Jon Stewart (born 1962) Television Host, Writer, Comedian “Dreams and dedication are a powerful combination.” —William Longgood Author…
Deconstruction has started!
…some good news from the engineer – they have continues checking my plans against Part C of the Guide and have not found any problems and were starting to mark…
A good day!
…a bit while they go through and check that I am compliant with Part C of the Guide and provide final markups. This has gone as I hoped was possible…
All Decked Out
…day had a healthy 1/3 done. Decking continued throughout the week and was completed with a just a half day in today. Second Storey Deck Complete – Ready to Frame!…
Variance Approved
…over the weekend to set up and had my site inspection yesterday where I dug 5 test holes for the engineer. I also was able to get an arborist out…
Wool Cap Complete
…the lower floor roofs. I had used a Sansin Blue Wood solution for the north roof (which was a test batch provided to RDH who had some left over and…
Cameras
…am looking for a service that will reliably stream the camera video or snapshots. While I test systems, the camera feeds may not always be available. Thanks for your understanding!…