Showing results 21 - 30 of 36 total.
The End does not always justify the effort getting there.
…find in 36″ rolls. I picked mine up at www.firestopcaulking.com Even small flows of moisture wash the uncured emulsion away. Mesh is hard to completely embed to ensure no pinholes….
Reaching for the stars!
…hour or about $0.70 – for up to the minute energy use see http://www.wattvision.com/house/overview?h=31169802&k=0ce131). Started out with my portable air conditioner that has a dehumidification setting. But the basement was…
Thankful for sponsors!
…had some understandable complaints!) Please stay healthy and stay safe in these difficult times. “Great things come from hard work and perseverance. No excuses.” —Kobe Bryant (1978-2020) Professional Basketball Player…
First Flush
…also concentrated on completing the hydronic heating/cooling panel design and handing off my LoopCAD model to my mechanical designer Daniel www.dsdesignconsultants.net Example of LoopCAD hydronic circuit design With the north…
Mommy – It’s raining INSIDE the house.
…day at the District hall where I picked up the environmental permit which included the soil removal and also the tree removal. I will leave the building permit and all…
Lafarge becomes a sponsor
…filled with spending money. At this point it looks like I need 36 full blocks and 6 half blocks for a total of 163,800 Lbs. I wonder if my property…
Rock Crushing and Removing Shiplap
…their operation. https://www.theenclosure.ca/cms/wp-content/uploads/2014/07/RockCrush.flv I also thought I would share a short clip showing my method for removing ship-lap. This was very brittle material (60 years old) and a lot of…
Operating at about 1/3 Speed
…lumber pieces, cleaned up and organized some lumber, and then helped me on the roof by cleaning off the heavy moss layer and then peeling back the roofing paper under…
Blower Door Complete – Results were AWESOME
…So without further adieu, the results .299 ACH50! I want to thanks Michael and Deborah from H&H Small Space Solutions for coming down from Lillooet and performing the test…
3 out of 4 – On the home stretch
Friday I finished framing and sheathing the upper south roof which now leaves only the last upper north roof to complete. The process is going faster now that I am…