Cats, Raccoon, and Skunks – Oh MY!
…action last night. Partly as a security measure, but also because of interest in what might be coming through the house now that it was wide open. I was not…
Working through Hydronic Panels and Completing HVAC equipment installation
…They are just a much better quality plate, compared to anything else I have seen on the market. Then in December of 2020, I showed you the completed installation of…
The End?
…was either going to be successful or a dismal failure. Unfortunately, it has been a utter and complete failure and I am not sure what the next step will be….
Floor Truss Package Installed!
…then the floor structure will be complete and ready for sheathing. I hope to have a majority of the sheathing complete by the end of the coming week. PS –…
ShedCam Time-lapse Videos Complete – Finally
…on the shed cam and have uploaded the following to my YouTube Chanel. I have to admit that the review today was a bit depressing. I really struggled last October…
ICF Rising
…cannot come soon enough! Fortunately, I know the system works as it already has been reviewed by my mentors in the building science field, and I have a large number…
Excavation Officially Completed
On Monday AM in addition to prepping for my shopping trip, I also met with the GeoTech on site to review the status of the excavation. Ben from DAVIES GEOTECHNICAL…
Tarp MD
…poly with welded wire mesh and securing to bank. We agreed that I would take a full video of the conditions and slopes so the lead engineer could review and…
First Second Floor Wall Complete
…with my roofing consultant has eaten up an additional 45 hours over the last week. Over the weekend and stat, I moved my workbench and computer station to the upper…
More to come
…used to. It is hard enough to do the product research needed to keep my material ordering on track to not delay construction. I am however still committed to documenting…